You don’t have to figure it out alone

See Your Path to Move-In

On Ameridura-owned lots, your path is an identified property and a selected production home — then factory production rather than starting from scratch on every house. Once land, financing, permits and project requirements are in place, we build on a repeatable schedule. Where a lender offers it, land, home and eligible site costs can close together before we set the house. That is not a promise that every buyer or every lot qualifies.

We’ll give you a project timeline based on your specific home, location and approvals.

What takes months doesn’t have to happen entirely on your property.

Your family doesn’t need a construction crew occupying the property for the entire manufacturing process. We build your home where manufacturing is most efficient: inside our factory. Then we bring the finished product to the community.

From land to keys

One home. One dedicated guide. One clear path forward.

  1. 01

    Choose your Ameridura

    The 1,250, The 1,500, The 1,850, The 2,100, The 2,500 or The 2,750. Those are the factory models. Official drawings come from Ameridura — not from this website.

  2. 02

    Choose your package

    Complete Home, Shell Kit, Dry-In Kit or Build Kit. Same house. Different level of completion.

  3. 03

    Choose what you finish locally

    On a kit, you and your licensed local trades supply fixtures, paint, appliances and final finishes. We manufacture the building system. You finish the house.

  4. 04

    Land, foundation and permits

    Site work, foundation and local permitting sit with the owner, developer or local builder. Ameridura master engineering is adapted to the jurisdiction; it is not a nationwide permit by itself.

  5. 05

    Deposit and production release

    A 25% deposit releases the house or kit onto the factory schedule.

  6. 06

    Factory manufacturing

    The ICF building system is manufactured in New Orleans East — not started from scratch on your lot.

  7. 07

    Delivery and local installation

    Complete Homes are delivered and set. Kits ship as a manufactured building system for licensed local installation.

  8. 08

    Finish and occupancy

    Complete Home buyers receive the finished house. Kit buyers complete owner/builder finishes locally, then occupy.

Your Homeownership Consultant

Every Ameridura homeowner gets a dedicated guide through land, financing, permits, plans, inspections, foundation, utilities, construction, delivery and final approvals.

  1. 01

    Find the right property

    Understand whether the land is appropriate for your Ameridura home and identify site considerations.

  2. 02

    Build your project budget

    We’ll help you understand the home price plus the major site-related costs.

  3. 03

    Financing

    We’ll help you understand available financing pathways and connect you with the appropriate lending resources.

  4. 04

    Permitting

    We’ll help guide you through the permitting and approval process and identify what needs to happen locally.

  5. 05

    Prepare the site

    Foundation, utilities, access and other site requirements are coordinated as part of the project.

  6. 06

    Build your home

    Your Ameridura home is produced using our standardized factory process.

  7. 07

    Deliver & complete

    The home moves from the factory to your property for installation and completion.

  8. 08

    Welcome home

    We help you understand the final steps toward occupancy and homeownership.

You buy the home. We help you navigate the journey.

See why we build with ICF

Two timelines — not a 30-day slogan

Approximately 20–36 working days of factory production once a home is released into production.

Approximately 3–7 days for site installation and completion activities, depending on the model and site.

Our factory-to-family objective is approximately 4–7 weeks from production release to a completed home — not from the day somebody walks into the showroom.

Permitting, financing, land acquisition, site preparation and foundation work can occur before or alongside factory production depending on the project. We’ll give you a project timeline based on your specific home, location and approvals.

Talk to a Homeownership Consultant