What it takes to build it all in-house

Homes, then apartments, then hotels. Named machines. What a lender can lien. Robots only where they earn a station. None of this raises the $5,000,000 Phase I ceiling.

The entire process

  1. 01

    Receive and kit

    Beads, forms, rebar, steel, openings, MEP, finishes land, get inspected, labeled, stored.

  2. 02

    Make the form (Phase II)

    EPS bead → pre-expand → age → mould ICF blocks → recycle offcuts. Phase I skips this and buys a tested form.

  3. 03

    Assemble the wall

    Forms, bucks, rebar kits, embeds, openings — the ICF envelope of the SKU.

  4. 04

    Reinforce

    Cut, bend, cage, tag. Heat/lot on every kit.

  5. 05

    Connectors and steel

    Plates, embeds, stairs, garage frame, transport hardware.

  6. 06

    Floor and roof cassettes

    Second floor and roof as factory tables, not field puzzles.

  7. 07

    Wet core / pods

    Kitchen, baths, laundry, hotel bathroom pods as repeatable modules.

  8. 08

    MEP prefab

    Harnesses, manifolds, ducts. Buy compressors, fixtures, devices.

  9. 09

    House / module assembly

    Walls + cassettes + MEP + finish under roof. QC packet. Serial.

  10. 10

    Concrete

    Phase I: purchased ready-mix after erection. Phase II: batch if cheaper.

  11. 11

    Ship and set

    Tractors, trailers, escorts, crane (contracted then owned), foundation, plumb, hookup.

  12. 12

    Commercial extras (apartments / hotels)

    IBC fire assemblies, stacked floors, corridors, sprinkler prefab, elevator interface. Different code. Different plant.

Homes vs apartments vs hotels

ProductCodeFactoryWhat else
Homes (IRC modular)IRC as adopted by Louisiana. Permanent foundation. FHA/Fannie/Freddie/USDA/VA on the buyer’s mortgage.Bayou-class SKUs on the 40,000-SF line. Phase I.None of the hotel stack. This is the loan.
Apartments / missing-middleIBC (not just IRC). Fire ratings, egress, accessibility, stacked modules or panelized walls.Longer tables, heavier rebar, corridor/shaft fixtures, fire-rated assemblies. Second line or second plant.UL/fire-tested wall and floor assemblies. Different PE. Different transport box.
HotelsIBC + hospitality: sprinklers, corridors, acoustic, stacked wet cores, elevator hoistway by others.Bathroom-pod line is the prize — one SKU, hundreds of rooms. Not a Bayou with more beds.Buy elevators (Otis / KONE / TK). Buy fire pumps. License the installer. The house line is not a hospitality plant.

Never make — even at 100%

  • Elevators and escalators — buy and hire the licensed installer
  • Fire pumps, generators, switchgear from a listed manufacturer
  • HVAC compressors / VRF outdoor units / chillers
  • Appliances, TVs, FF&E for hotels
  • Float glass / IGUs from silica
  • Cement from limestone; aggregate quarry
  • Steel from ore
  • Semiconductor controls
  • A high-rise stick-built on the 40,000-SF floor

Robots — only where they earn it

Phase I has CNC and handheld auto-tiers. That is enough while the plant is commissioning. The first real robot is a cobot that palletizes forms once the line is a factory. A KUKA house factory is a later file. This floor’s designed factory is 20–24 homes a month on two shifts.

CellMachineWhenBandWhy / why not
Warehouse / ICFCollaborative palletizing cell

Universal Robots UR10e / UR20 or FANUC CRX with PalletPRO; Robotiq grippers

Robot — Phase II$55,000–$95,000First robot that earns its keep. Palletizing is dull, heavy, repeatable. Does NOT fit the $5M Phase I mfg bucket unless we cut the paint booth (~$24k) AND a forklift — still short. Buy after form volume is real.
ICF / CNCMachine-tending cobot

UR10e or FANUC CRX-10iA/L

Robot — Phase II$50,000–$85,000Handy once the CNC runs two shifts. One operator plus cobot beats a second hire before a KUKA line.
WarehouseUsed UR10 palletizing cell (stripped)

Used Universal Robots integrator (U.S.)

Robot only if we cut$35,000–$55,000Only if we cut ~$45k from Phase I (e.g. defer spray booth to contract paint, or skip the second tractor). Not recommended. Labor is cheaper than a robot in the stand-up year. Revisit when the line is at mature one-shift (~108/year), not while commissioning.
RebarRebar machining center

Schnell / KRB / MEP / WEIBUILD class

Robot — Phase II$400,000–$1,500,000This is the robot (gantry + magazines) that matters for apartments/hotels — tons of bar. A one-shift house mix does not pay for it. A hospitality pad of repeating rooms starts to.
SteelRobotic MIG cell + positioner

Lincoln / Miller + FANUC Arc Mate or ABB IRB; or KUKA

Robot — Phase II$140,000–$320,000Handy for apartment/hotel steel chassis (Z Modular does this). Not handy for a handful of Bayou garages in the stand-up year.
SteelPowder booth + oven, or robotic coat later

Gema / Nordson class

Robot — Phase III$80,000–$220,000Manual powder first. Robot coat when SKUs freeze.
HandlingAMR / AGV fleet (2–6 units)

MiR / OTTO Motors / Fetch

Robot — Phase III$120,000–$400,000Handy in a 80k+ SF plant with frozen aisles. A waste of money in 40,000 SF with two forklifts.
FinishingPaint robot in the existing booth

ABB IRB 5500 / FANUC Paint or a used integrator cell

Robot — Phase III$90,000–$220,000Handy when finish SKUs freeze and volume is daily. Not handy while the plant is commissioning.
QCLaser tracker / 3D scanner cell

FARO / Leica AT960 / Creaform

Robot — Phase II$45,000–$140,000Metrology, not a welding robot. Pays on first-article and stacked hotel modules.
Commercial modulesLonger framing tables, stacking jigs, fire-board station

In-house + Randek / Weinmann class panel line if wood; ICF remains our wall

Robot — Phase III$200,000–$900,000Weinmann/Randek are wood-panel robots. We only buy that if we add a wood panel SKU. ICF apartments still need stacking jigs, not a German timber line.
MEP prefabIndustrial wire machine + PEX manifold CNC

Komax / Schleuniger + Uponor industrial

Robot — Phase II$45,000–$110,000The wire machine is the automation. A cobot can load harness boards. A stand-up year of houses does not need it. Hotel bathroom pods and a repeating hospitality SKU do.
Real estate80,000–120,000 SF commercial module plant

New or reused industrial — not the 40,000-SF house building stretched

Not this company yet$8,000,000–$18,000,000KUKA ‘automated modular house building’ turnkeys live here — tens of millions. That is a different company until Louisiana houses print money.
Full auto house lineKUKA / similar automated modular-house system

KUKA automated modular house building

Not this company yet$8,000,000–$25,000,000Available. Not in budget. Not Phase I, II, or a $5M ITL. Revisit after a proven plant and a second capital raise.

Named equipment — the rest of the process

Phase II mid-range about $3,442,000–$8,760,000. Phase III (second plant / KUKA class) $16,410,000–$44,520,000. Planning bands, not quotes.

PhaseCellMachineOEM classProductLowHighLien
IICF assemblyCNC foam / hot-wire + tables + jigs (in Phase I budget)

Cut and assemble purchased forms

U.S. foam CNC (Hotwire class)home, apt, hotel$95,000$95,000ucc
IRebarCNC bender, cutter, stirrup, jigs, MAX tying tools (in Phase I budget)

Cut, bend, cage, tag

KRB / Schnell class + MAXhome, apt, hotel$155,000$155,000ucc
IFloor + roofFraming tables, panel saw, CNC router, lifting fixtures (in Phase I budget)

Factory floor and roof cassettes

In-house tables + U.S. wood CNChome, apt, hotel$115,000$115,000ucc
IMEP prefabWire, PEX, duct plasma, test stands (in Phase I budget)

Harnesses, manifolds, ducts

Komax class / Uponor / HVAC plasmahome, apt, hotel$90,000$90,000ucc
IKitchen + bathCabinet saws, edgebander, shower station (in Phase I budget)

Wet core as an assembly

Used SCM / Holz-Her class + Schluter toolshome, apt, hotel$68,000$68,000ucc
IFinishingSpray booth + HVLP (in Phase I budget)

Factory paint and cladding packages

U.S. booth / Graco classhome$52,000$52,000ucc
IShip and setTractors, trailers, telehandler, mini-ex (in Phase I budget). Crane contracted.

Deliver and erect

Used Class 8 + construction fleethome, apt, hotel$300,000$300,000title
IIWarehouse / ICFCollaborative palletizing cell

Palletize forms, kits, finished blocks

Universal Robots UR10e / UR20 or FANUC CRX with PalletPRO; Robotiq grippershome, apt, hotel$55,000$95,000ucc
IIICF / CNCMachine-tending cobot

Tend the foam CNC and label

UR10e or FANUC CRX-10iA/Lhome, apt, hotel$50,000$85,000ucc
IWarehouseUsed UR10 palletizing cell (stripped)

Optional Day-1 cobot if something else is deleted

Used Universal Robots integrator (U.S.)home$35,000$55,000ucc
IIEPS plantBatch or continuous pre-expander + aging silos + convey

Pre-expand beads

Modix USA / Dongshan / Epsole classhome, apt, hotel$180,000$420,000ucc
IIEPS plantShape-moulding press (SPZ-140TE class, ~1,200×1,400 mm, ~8.5 t)

Mould ICF blocks

Ebid Toys SPZ-140TE class / Modix USA / Dongshan. Prefer U.S. support for SBA collateral.home, apt, hotel$120,000$280,000ucc
IIEPS plantStraight, corner, T, lintel, buck, half-height moulds

Tooling for the Ameridura form family

Same press OEM + independent mould shophome, apt, hotel$250,000$650,000ucc
IIEPS utilities1–4 t/h boiler, accumulator, vacuum, cooling tower, compressor

Steam, vacuum, cooling, air

Cleaver-Brooks / Miura class boiler (U.S.) + EPS-line auxiliarieshome, apt, hotel$280,000$650,000fixture
IIEPS plantEPS crusher / densifier / reclaim

Grind and reuse offcuts

INTCO / GreenMax class or EPS-line OEMhome, apt, hotel$40,000$120,000ucc
IIReal estateDedicated EPS / ICF manufacturing bay (Zone J on the 7-acre plant parcel)

House the EPS plant

Metal building — separate from the 40,000-SF house line (fire, steam, pentane)home, apt, hotel$400,000$1,200,000real-estate
IIConcreteReady-mix batch plant, silos, reclaim

Batch instead of buying every yard

Vince Hagan / Erie Strayer / CTB class (used U.S. plants exist)home, apt, hotel$350,000$600,000fixture
IIRebarRebar machining center

Automated cut / bend / pack by component

Schnell / KRB / MEP / WEIBUILD classhome, apt, hotel$400,000$1,500,000ucc
IISteelFiber laser + shuttle table

Cut plate and tube faster than plasma

Mazak / TRUMPF / Cincinnati / used U.S. 4–6 kWhome, apt, hotel$250,000$550,000ucc
IISteelRobotic MIG cell + positioner

Weld connectors and module frames

Lincoln / Miller + FANUC Arc Mate or ABB IRB; or KUKAapt, hotel$140,000$320,000ucc
IISteelPowder booth + oven, or robotic coat later

Coat frames

Gema / Nordson classapt, hotel$80,000$220,000ucc
IIHandlingOverhead bridge crane

Lift finished modules inside the plant

Konecranes / Street / Spanco classhome, apt, hotel$150,000$400,000fixture
IIIHandlingAMR / AGV fleet (2–6 units)

Move kits between cells

MiR / OTTO Motors / Fetchhome, apt, hotel$120,000$400,000ucc
IIIFinishingPaint robot in the existing booth

Spray interior/exterior packages

ABB IRB 5500 / FANUC Paint or a used integrator cellhome, apt, hotel$90,000$220,000ucc
IIQCLaser tracker / 3D scanner cell

Dimensional scan of modules

FARO / Leica AT960 / Creaformhome, apt, hotel$45,000$140,000ucc
IIMillworkNesting CNC router + software

Nested CNC for boxes

SCM / Biesse / Homag classhome, apt, hotel$80,000$180,000ucc
IIStoneCNC stone / waterjet

Countertops

Park Industries / Breton classhome, hotel$150,000$300,000ucc
IIHotel / apt wet corePod assembly line: waterproofing, fixtures, test, crate

Bathroom and kitchen pods

In-house fixtures + Schluter / Kerdi systems; not a branded robot lineapt, hotel$80,000$220,000ucc
IIICommercial modulesLonger framing tables, stacking jigs, fire-board station

Stackable floor cassettes and corridor modules

In-house + Randek / Weinmann class panel line if wood; ICF remains our wallapt, hotel$200,000$900,000ucc
IIFire protection prefabVictaulic grooving + cut shop

Cut, groove, kit sprinkler mains

Victaulic / Ridgid / Wheeler-Rexapt, hotel$12,000$40,000ucc
IIMEP prefabIndustrial wire machine + PEX manifold CNC

Faster harness and manifold production for pods

Komax / Schleuniger + Uponor industrialhome, apt, hotel$45,000$110,000ucc
IIWindows + doorsWindow/door assembly depth: tables, hardware, seal, test

Assemble opening packages instead of buying finished units only

In-house + bought IGUs (Cardinal / similar). Never melt glass.home, apt, hotel$25,000$80,000ucc
IICommercial extrasIBC mock-up bay + accredited-lab fire/acoustic retainers (UL / Intertek class)

Prove fire and acoustic assemblies before selling apartments or hotels

Lab partners. In-house mock-up walls and floor cassettes.apt, hotel$80,000$250,000poor
IIIReal estate80,000–120,000 SF commercial module plant

Second plant for commercial volume

New or reused industrial — not the 40,000-SF house building stretchedapt, hotel$8,000,000$18,000,000real-estate
IIIFull auto house lineKUKA / similar automated modular-house system

Turnkey robotic modular factory

KUKA automated modular house buildinghome, apt$8,000,000$25,000,000ucc
IISiteAll-terrain crane (owned when utilization pays)

Set modules

Grove / Liebherr / Tadano usedhome, apt, hotel$180,000$350,000title
Phase II + III planning (excludes Phase I already bought)$19,852,000$53,280,000

Future collateral — do not pledge it on this ITL

Identified so the next loan is not blind. Phase II midpoint $5,936,000 — that is the file after this one. Phase III (second plant / KUKA class) $30,465,000. Combined $36,401,000. No UCC until the invoice exists. Lab retainers and mock-ups are not listed — they are not collateral. Phase I machines that can actually be pledged are on /collateral, with the as-completed plant and the BPO.

SKUAssetPhasePlanning valueHow it would be liened
EQ-FUT-R-COBOT-PALLETCollaborative palletizing cell

Universal Robots UR10e / UR20 or FANUC CRX with PalletPRO; Robotiq grippers

2$75,000UCC-1 when purchased
EQ-FUT-R-COBOT-TENDMachine-tending cobot

UR10e or FANUC CRX-10iA/L

2$67,500UCC-1 when purchased
EQ-FUT-EPS-PREBatch or continuous pre-expander + aging silos + convey

Modix USA / Dongshan / Epsole class

2$300,000UCC-1 when purchased
EQ-FUT-EPS-PRESSShape-moulding press (SPZ-140TE class, ~1,200×1,400 mm, ~8.5 t)

Ebid Toys SPZ-140TE class / Modix USA / Dongshan. Prefer U.S. support for SBA collateral.

2$200,000UCC-1 when purchased
EQ-FUT-EPS-MOULDSStraight, corner, T, lintel, buck, half-height moulds

Same press OEM + independent mould shop

2$450,000UCC-1 when purchased
EQ-FUT-EPS-STEAM1–4 t/h boiler, accumulator, vacuum, cooling tower, compressor

Cleaver-Brooks / Miura class boiler (U.S.) + EPS-line auxiliaries

2$465,000Fixture vs UCC — counsel at purchase
EQ-FUT-EPS-RECYCLEEPS crusher / densifier / reclaim

INTCO / GreenMax class or EPS-line OEM

2$80,000UCC-1 when purchased
EQ-FUT-EPS-BUILDINGDedicated EPS / ICF manufacturing bay (Zone J on the 7-acre plant parcel)

Metal building — separate from the 40,000-SF house line (fire, steam, pentane)

2$800,000Later 504 / mortgage
EQ-FUT-CT-BATCHReady-mix batch plant, silos, reclaim

Vince Hagan / Erie Strayer / CTB class (used U.S. plants exist)

2$475,000Fixture vs UCC — counsel at purchase
EQ-FUT-RB-AUTO-LINERebar machining center

Schnell / KRB / MEP / WEIBUILD class

2$950,000UCC-1 when purchased
EQ-FUT-ST-FIBERFiber laser + shuttle table

Mazak / TRUMPF / Cincinnati / used U.S. 4–6 kW

2$400,000UCC-1 when purchased
EQ-FUT-ST-WELD-CELLRobotic MIG cell + positioner

Lincoln / Miller + FANUC Arc Mate or ABB IRB; or KUKA

2$230,000UCC-1 when purchased
EQ-FUT-ST-POWDERPowder booth + oven, or robotic coat later

Gema / Nordson class

2$150,000UCC-1 when purchased
EQ-FUT-MH-BRIDGEOverhead bridge crane

Konecranes / Street / Spanco class

2$275,000Fixture vs UCC — counsel at purchase
EQ-FUT-MH-AMRAMR / AGV fleet (2–6 units)

MiR / OTTO Motors / Fetch

3$260,000UCC-1 when purchased
EQ-FUT-FN-PAINT-BOTPaint robot in the existing booth

ABB IRB 5500 / FANUC Paint or a used integrator cell

3$155,000UCC-1 when purchased
EQ-FUT-QC-SCANLaser tracker / 3D scanner cell

FARO / Leica AT960 / Creaform

2$92,500UCC-1 when purchased
EQ-FUT-CB-NESTINGNesting CNC router + software

SCM / Biesse / Homag class

2$130,000UCC-1 when purchased
EQ-FUT-CB-WATERJETCNC stone / waterjet

Park Industries / Breton class

2$225,000UCC-1 when purchased
EQ-FUT-HT-PODPod assembly line: waterproofing, fixtures, test, crate

In-house fixtures + Schluter / Kerdi systems; not a branded robot line

2$150,000UCC-1 when purchased
EQ-FUT-HT-STACKLonger framing tables, stacking jigs, fire-board station

In-house + Randek / Weinmann class panel line if wood; ICF remains our wall

3$550,000UCC-1 when purchased
EQ-FUT-HT-SPRINKLERVictaulic grooving + cut shop

Victaulic / Ridgid / Wheeler-Rex

2$26,000UCC-1 when purchased
EQ-FUT-MEP-AUTOIndustrial wire machine + PEX manifold CNC

Komax / Schleuniger + Uponor industrial

2$77,500UCC-1 when purchased
EQ-FUT-WD-DEPTHWindow/door assembly depth: tables, hardware, seal, test

In-house + bought IGUs (Cardinal / similar). Never melt glass.

2$52,500UCC-1 when purchased
EQ-FUT-HT-PLANT80,000–120,000 SF commercial module plant

New or reused industrial — not the 40,000-SF house building stretched

3$13,000,000Later 504 / mortgage
EQ-FUT-KUKA-LINEKUKA / similar automated modular-house system

KUKA automated modular house building

3$16,500,000UCC-1 when purchased
EQ-FUT-FL-CRANEAll-terrain crane (owned when utilization pays)

Grove / Liebherr / Tadano used